I had an inspector last year say that the "full boat", neutral common with 3 hots in a 3PH system, is going away; has anyone else heard of that.
This is in an industrial building.
Also, can't find the code ref., but can you put a multiwire circuit on a 2 pole breaker? This is in an industrial location with 2 120v CKT's coming from a panelboard running building outlets. I know you could on 2 single pole breakers if the above rule works out.
thx,
This is in an industrial building.
Also, can't find the code ref., but can you put a multiwire circuit on a 2 pole breaker? This is in an industrial location with 2 120v CKT's coming from a panelboard running building outlets. I know you could on 2 single pole breakers if the above rule works out.
thx,