Time and again I see service panels where the neutral and grounding busses are full...and by full I mean three or four grounding wires under the same terminal screw and two or three grounded wires under a single termianl screw (and sometimes mixed with grounding wires). Obviously as far as Code goes this is a big no no.
My two part question is: (1) can equipment grounding wires be spliced together in a service panel to make room for adding an additional circuit (since only one grounded wire can be under a single terminal screw) and (2) is there a better way short of replacing the entire panel to make more room for additional grounded wires (or clean-up the existing messy panel)?
My two part question is: (1) can equipment grounding wires be spliced together in a service panel to make room for adding an additional circuit (since only one grounded wire can be under a single terminal screw) and (2) is there a better way short of replacing the entire panel to make more room for additional grounded wires (or clean-up the existing messy panel)?