Finished basement with hung ceiling and recessed lights
The rough in enclosed cans are mounted to the wood floor joists
The trims use springs for connecting trims to cans.
The hung ceiling acoustic tile is s couple inches down from the flood joist so that there is a 2 or 3 " gap between the frame in kit and tile ( trim )
Unlike the gap in s device box from the box to the surface of dry wall, is this acceptable ??
Thank you