If a multifamily building has gas service and intend to install gas dryers, gas ranges, and gas furnaces in all dwelling units, then do you include a KVA load for dryers, ranges, furnaces in the service load calculations per NEC 220? I have a city permit reviewer arguing that I should include 5KVA for dryers, 8KVA for ranges, etc. :blink: