I cant find where this is wrong but something feels wrong about it. A 3/4 rigid conduit feeding power to a fuel Island and a fiberglass gas line(gasoline not natural gas) crossing paths in the same ditch and touching in 2 different locations. Is this right, wrong or am I just over thinking?