The GC wants Brant's sub to do the Fire Alarm but he has found someone else to do the networking at a cheaper price. It's the low voltage part of the job that the GC now wants to split.
Brant and the low voltage sub may be willing to let someone else do this portion of the work but it doesn't sound as if the GC has made a buyout offer.
Yeh...... this is what's happened.
I spoke to my sub today. He's willing to let that part of the job go as he didn't have much profit on it. I didn't ask him to, he volunteered. He also thinks whoever is lower didn't attend pre-bid. There are some things not detailed on plans that only say "relo & protect as required" for the server room. That includes relocating a 400/pair copper line that isn't detailed on the drawings, but covered under that line above.