If it is a bid requirement, you need to figure out what it is going to cost and include it.GC requires in bid to supply all the POCO cost and phone co cost as part of bid. Has anyone run into that? Usually this is all done preconstruction any advise with these types of bids
Most of the time here, POCO drawings and fees are not available at bid time.
At the most the building engineer and utility engineer will have agreed on a transformer location.