I'm trying to feed 3 panels in duplex from a 320A pedestal service. One panel will be on the second floor for the upper unit, one will be on the first floor for that unit, and one will be in the basement for the hot water tanks and AC units. My original thought was a 400A disconnect outside and then take from the load side of that to each panel but i haven't come across anything that looks like it will fit 3 sets of wires. Second thought was come out of a disconnect and hit a main lug 400A or 320A rated main lug panel with room to feed 3 panels. I'm just having a hard time coming up with the proper gear. Any suggestions?