We always land the GEC(s) in the service disconnect. Not sure what you mean by a bare wire?
Around here a lot of the services have a #4 bare GEC. Are you allowed to go through the meter can or do you have to drill an extra hole to get to the rod?(if the service disconnect is inside the building)