My AHJ requires a disconnect mounted on the exterior of the detached shed prior to the interior sub panel . This is a 60A disconnect feeding the 60A shed sub panel. I have installed two ground rods 8 feet apart.
250.32(B)(1) seems to indicate both the service disconnect and the sub panel should be connected the the GEC. My question is do I run the GEC from the GES to the sub panel and the disconnect? My AHJ sometimes wings it and not in a good way, so was hoping to get some feedback