D Dustin_B Member Dec 30, 2008 #21 The main breaker for each unit is outside. All inside panels at that point are sub panels requiring no main breaker. If it goes to another structure our AHJ requires a main.
The main breaker for each unit is outside. All inside panels at that point are sub panels requiring no main breaker. If it goes to another structure our AHJ requires a main.