chevyx92
Senior Member
- Location
- VA BCH, VA
Have an 800A Fused main switch that feeds sectional meter stacks. Inspector today quoted 250.24 and said that all my GEC's need to land on the neutral bar. My #6 from my ground rods wasn't landed on the neutral bar beacuse there was no way to land a #6 with the factory lugs provided and you couldn't add one. So, I set a lug on the side of the can(scraped paint of course) and landed it there. I do have my cold water GEC on the neutral bar and bonding strap in place. Is the inspector right? And if so, like I asked her, where was I suppose to land it if there is no provision for this small wire. All the extra lugs were way to big.