stew
Senior Member
- Location
- federal way,washington
One of our electricians is installing a generac generator with a 200 amp service rated trnasfer switch. The service disconnect is incorporated as part of the transfer switch assembly. He intercepted the service wire from the meter and went to the transfer swith disconnect. good so far but then he nippled back to the meter can and sent the conductors from the transfer switch load side to the panel via the meter can and back thru the existing nipple to the panel. My contention is that the conductors after the service disconnect from the transfer swith are now feeders and not service conductors and should not occupy the same raceway(meter can used now as raceway). Am I correct and should another raceway be provided? my sense says yes.
