We have a customer who needs a generator he has 2 100 hp 480v motors 1 main motor 1 lag both run off vfd's and a 200 amp load that continuous from transformers 480/277 not sure if there is any other equipment to add. My boss will be renting a 500kw unit from ever thing i here.
Are they close with there estimate on sizing this thing ? Not sure how they come up with that size.
Are they close with there estimate on sizing this thing ? Not sure how they come up with that size.