I have a building being fed with 4/0 Aluminum quad overhead from utility transformer to a 400 Amp indoor disconnect. They purchased a 30KW generator and had another contractor tell them they could run 200 amp manual double throw to feed there shop. I am not all that versed on generators so I thought you guys maybe could help me out. If I bid this job with the 400 Amp 3 phase double throw and 2-3/0 copper runs I am going to get beat against somebody running half the size.