mshields
Senior Member
- Location
- Boston, MA
My question pertains to the sections required in a generator switchboard which feeds Life Safety, Critical, Fire Pump and Equipment loads. I know that the Life safety and critical need to be in their own sections and that the Fire Pump needs to be in a detached isolated section.
My question is about the tap to the fire pump breaker.
I've got one dedicated section for my incoming 1200A feeder. Do I need to bus to another dedicated section for the tap to the fire pump breaker?
Thanks,
Mike
My question is about the tap to the fire pump breaker.
I've got one dedicated section for my incoming 1200A feeder. Do I need to bus to another dedicated section for the tap to the fire pump breaker?
Thanks,
Mike