andy74bronco
New member
- Location
- north eastern wisconsin
Hi i am pretty sure I know the answer but I would like some verification on this subject. I am looking at a large generator transfer switch job. The service is 600 amp three phase 120/208. When a transfer switch is installed in front of the main breaker/breakers does the bonding needs to be moved and the new main breaker is now in the transfer switch? Then the transfer switch needs to be service entrance rated and also have a breaker? It is a big job and just in bidding stage. The load is not that big which is not related to this question just back ground information. I called the power company and the largest load last year in September was 27kw. Thanks for your help. I am guessing a small residential situation would be the same with a whole house transfer switch.