SmithBuilt
Senior Member
- Location
- Foothills of NC
I installed a new service on a barn. Then feed an old sub panel, which is on the other side of the barn. The sub panel was previously feed from another building and therefore had a ground rod, neutrals and grounds separated.
Is it ok to leave the ground rod at the sub panel?
Is it ok to leave the ground rod at the sub panel?