Hi all;
There is an existing 3000A, 480/277V switchboard, and I need to add another section to house a new 2000A, 3 phase, 3W circuitbreaker which will feed a new 2000A, 3 phase, 3w switchboard. I have been told by the rep that I can't get the 2000A circuit breaker with GFP because this system is a 3 wire system and I have to have a reference to ground in order to do it. Also, he mention that I can't have TVSS for the 3 wire system. Can any one please explain why we can't have a GFP and a TVSS...thank you all in advance
p.s. (this project is a data center and I have been told to use a 3 wire system to reduce the ground fault, which i'm not sure why!!!!)
Thansk again,
There is an existing 3000A, 480/277V switchboard, and I need to add another section to house a new 2000A, 3 phase, 3W circuitbreaker which will feed a new 2000A, 3 phase, 3w switchboard. I have been told by the rep that I can't get the 2000A circuit breaker with GFP because this system is a 3 wire system and I have to have a reference to ground in order to do it. Also, he mention that I can't have TVSS for the 3 wire system. Can any one please explain why we can't have a GFP and a TVSS...thank you all in advance
p.s. (this project is a data center and I have been told to use a 3 wire system to reduce the ground fault, which i'm not sure why!!!!)
Thansk again,