I work in several different jurisdictions, most of which are on the 2017 NEC.
The question is when required to mount the exterior service safety disconnect switch...is this actually the Main now? Requiring SER to panel on other side of wall and all the grounding and bonding done outside? Thanks!
The question is when required to mount the exterior service safety disconnect switch...is this actually the Main now? Requiring SER to panel on other side of wall and all the grounding and bonding done outside? Thanks!