Same thing here in WI. Drive 2 and call it a day! Of course the better bet is the CEE.Originally posted by paul:
Several years ago, the state of WA went around the state and tested several ground rods. Out of all of those tested, not one met 25Ω or less. Now, unless we can prove to the inspector that we have met that threshold, we must pound two rods. It's easier and cheaper to pound the 2nd rod in the ground.