Two questions:
1. What is a "wall wart"?
2. Did the IT guy specifically ask for two receptacles to be ground up, and the other two to be ground down?
One comment:
I am in the middle of several projects for which IT equipment is to be placed in racks, and for which there is a quad receptacle between each rack. Much of the rack-mounted equipment is plug and cord connected. So in your installation I would not be surprised to learn (if this indeed is true) that the up/down request was based on having some equipment higher than the outlet box and other equipment lower than the box, and based on the IT guy's notion of cord management.