erock1
Member
- Location
- Houston, Tx
My question is, I have a 2000 amp mdp with 12 3" emt and 5 1 1/4 emt coming out of the top of it. I have ground bushing on all of the connectors in the mdp. On the other end of the 3" emt they go in to 6 36" x36" jbox. My project manager wants to see grounding bushing on the pipes coming in and leaving the jboxes. Same with the 1 1/4 they go in to 4 24x24 boxes. No splices in any of the boxes, voltage is 480. It seems like a lot more grounding then necessary. I understand on the service side but none of the hole are concentric or eccentric. Code references would help me out, thanks.