I have a 400 amp 3 phase service being supplied with 4 500 mcm copper. All the grounds go directly from their grounding point to the main disconnect. There are 2 ground rods 6 ft. apart with #6 copper, a water line ground with #1/0 copper, a re-rod ground with #4 copper and a building steel ground with # 1/0 ground. Does this sound correct ?