kwired
Electron manager
- Location
- NE Nebraska
- Occupation
- EC
One thing that is not pointed out in that image is that only the first 5 feet of entrance of the water pipe is allowed to be used for connecting GEC or bonding jumpers between grounding electrodes. But what is there could be done if it complies with that 5 foot rule.