Are there any exceptions for the grounding electrode conductor not be taken to the first service disconnect means? Utility does not allow it to come out of the meter socket or ct can .I didn't think that it could come out of a panel that is located after the first point of disconnect, am I wrong? Have another contractor who feels it's code compliant to come to the first distribution panel with it instead of outside to the first disconnect. Thanks.