I am currently thinking of proposing an ammendment to have electrical contractors keep grounding electrodes 2' off of the structure. My concern is the soil that is used to fill around the foundation as far as resistance to ground. My other concern is the moisture change since typically it would be partially protected by the drip edge and in some cases drain tiles. Does this make sence based on the fact that the NEC doesn't really address this unless classified as a lightning protection system? I know a lot of inspectors in my area enforce this, but we always try to make sure we back it up with code. Thanks