I am having a debate with the management of a commercial building about code.
All wiring is in EMT conduit. All runs are using AWG 12.
I am insisting on running one green ground conductor per conduit run. Whenever a connection is made within a box, I ground the box as well as the device using the green ground conductor.
Management only wants to run the green ground condutor to the beginning of each conduit run, terminate the green ground conductor to the EMT, and then only use the EMT conduit as ground for the devices down the conduit run.
Refresh my memory as far as code. Please comment.
All wiring is in EMT conduit. All runs are using AWG 12.
I am insisting on running one green ground conductor per conduit run. Whenever a connection is made within a box, I ground the box as well as the device using the green ground conductor.
Management only wants to run the green ground condutor to the beginning of each conduit run, terminate the green ground conductor to the EMT, and then only use the EMT conduit as ground for the devices down the conduit run.
Refresh my memory as far as code. Please comment.