We have encountered an insteresting scenerio:
A run of 2" conduit between an outside disconnect box, and the inside load center. Ho-hum, except that part of the run is metal EMT, and then it goes outside to an LB, and from there it transitions to PVC.
I was worried about the proper grounding of said metal conduit, since there was this short section of PVC in there. Even though the EMT is grounded at the far end, I wondered should I install a grounding lug inside of the LB, and bond that end of the metal pipe run to the ground bar in the outside disconnect as well?
A run of 2" conduit between an outside disconnect box, and the inside load center. Ho-hum, except that part of the run is metal EMT, and then it goes outside to an LB, and from there it transitions to PVC.
I was worried about the proper grounding of said metal conduit, since there was this short section of PVC in there. Even though the EMT is grounded at the far end, I wondered should I install a grounding lug inside of the LB, and bond that end of the metal pipe run to the ground bar in the outside disconnect as well?