majpe
Member
My company just design two buildings at an airport with a metal exterior shell. There are electrical power panels inside the building. We grounded the service, but did not ground the metal exterior shell. As I read the code, I take it that we have to at least bond the metal frames to the service ground. I know this is good practice, but is it a requirement?