Kind of getting confused here, ok say if I have 2 ground rods and gec going to meter enclosure bonded to neutral, and 3 wire se from meter enclosure to main disconnect panel in basement, and another gec from water pipe to panel bonded with neutral. I have the 08 handbook and the way I read it and looking at pics , I am getting mixed feelings, right and wrong.
Also say you have 2 ground rods and gec going to water pipe and then main disco bonded with neutral, and also a gec from meter enclosure bonded with neutral back to main disco. Do you feel these are problems or violations?. I would appreciate any info or thoughts thanks.:
Also say you have 2 ground rods and gec going to water pipe and then main disco bonded with neutral, and also a gec from meter enclosure bonded with neutral back to main disco. Do you feel these are problems or violations?. I would appreciate any info or thoughts thanks.: