when you run 4 3c 500mcm cables with a #2 ground in each cable to a 1600 amp main breaker in switchgear feeding main lugs in mcc and the cables are ran in in the same run of cable tray do you have to run a sificant ground for the full load with each cable or one ground for all 4 runs?