- Location
- Lake City, FL
- Occupation
- Master Electrician
I am in the process of installing a 100kw back-up generator, the service is three/phase, 4-wire, all conductors are 500mcm copper. the transfer switch is a 3-pole, with isolated lugs for nuetral, I am planing on using a 400a nema3 breaker ahead of the transfer switch. Does anyone know what needs to be done for grounding?