Str1ve13
Member
- Location
- Orlando, FL

Hey Guys Question about grounding sizes,
As you can see in my image I have an existing trough system with 4 sets of 4#500MCM AL coming from the utility transformer feeding into a wireway. The wireway is being fed by a 250MCM AL GEC.
Now I am adding a 200A Service to this trough and my question is out of the trough do I use table 250.66 to size the tap for the 200A fused disconnect switch (Note#4). Then from the disconnect to the tenant's panel can that be considered an EGC and use table 250.122 (Note #3)?
Also, I haven't heard a problem of mixing Aluminum and Copper, are there any by chance?
Thanks