Samuel Ramser
Member
- Location
- Cleveland Ohio Area
I would like to increase the size of the 100 amp single phase service to 225 amps in the house and eliminate a second 100 amp single phase service on the property by refeeding a new 125 amp distribution panel from the panel in the home. The second service that i want to eliminate currently feeds several small storage buildings. My question is can i do the grounding at the upgraded 225 amp panel in the house and carry a proper size grounding conductor with phase and neutral conductors to a new distribution panel in one of the out buildings. I would like to have a MCB in the distribution located in the out building panel for convience. Do i need a second set of ground rods at the outbuilding distribution panel? There is no water in the outbuildings.