So i ran into a bit of a problem and need a solution. I have a job that im stepping in finishing up what another contractor left behind. I know the coffee states that we allude have two source for grounding, bld steal, cold water, grnd electrode etc... This building has been remodeled and there is only one spit to ground and that from the rebar left from the old panel that was installed. The plumbing pipes or cold water are pvc and the bldg is wood. I tried going through the concrete but it's very thick its more than a 1ft ( old gas station garage). Is there any other solutions i can do before i order my final inspection.