I hope this is a simple question that won't stirr up alot of trouble!!!!!! In my town they do not allow grounding to the water pipes. They want 2 rods (1/2 x 8) min. 6 ft. apart. This is for 200 amp 120/240 single phase undergound srv new construction. Is there a better way? How about Ufer grnd system? How about a #2 grnd wire connected to #4 rebar in the footing min. 4ft down around entire building then up thru the concrete wall, then to the 2 grnd rods, then to the meter base? Thanks Gunny