I have an inspector said that I need a ground rod driven. I have uffer ground in the slab. He said I need a secondary ground. If I am not mistaken you only need a supplement ground is when you use the metal underground water pipe system. He also said that I needed to separate the grounds and neutrals at the main panel. HELP!!!