I am bidding on a commercial job that came up. I dont do much commercial work, so i figured i should try to get some help here.
The job consist of an existing 150 amp 1 phase QO panel with way too many tandems in it already.Was planning on adding a 200 amp 1 phase panel and re-feeding the 150 as a sub-panel, the CT box is indoors right next to panel.
Can i just add a 200 amp 1 phase panel and leave the 150, both of which would be feed of of the load side of the CT box. has place for two lugs per phase. Panels with mains would be grouped.
Need to add, What would your price be and how many man hours would you figure. I am a one-man show, but may be able to get a second hand.
1-60 amp 220 feed for stand up tanning bed (approx) 75' from panel
2-35 amp 220 feeds for tanning bed (approx) 40' each
1-30 amp feed for tanning bed (approx) 30'
Buck/boost will be supplied by owner
Here is the catch, the owner of the building has told the tenent that under no circumstances shall any electrician pull a permit for job. I told her that i would't be intersted in doing the work without a permit.The tenent called and scheduled a meeting to speak to building owner tonight about this issue.
Also please let me know what you would do about the building owner/permit issue.I thought about calling inspector in the morning and giving him the address and expain the issue. Maybe just tell him to do whatever he wishes with the info. Thanks in advance for the help
I will post my numbers to see if i am close to anybody elses.Have to wait to get pricing from supply house tomm.
The job consist of an existing 150 amp 1 phase QO panel with way too many tandems in it already.Was planning on adding a 200 amp 1 phase panel and re-feeding the 150 as a sub-panel, the CT box is indoors right next to panel.
Can i just add a 200 amp 1 phase panel and leave the 150, both of which would be feed of of the load side of the CT box. has place for two lugs per phase. Panels with mains would be grouped.
Need to add, What would your price be and how many man hours would you figure. I am a one-man show, but may be able to get a second hand.
1-60 amp 220 feed for stand up tanning bed (approx) 75' from panel
2-35 amp 220 feeds for tanning bed (approx) 40' each
1-30 amp feed for tanning bed (approx) 30'
Buck/boost will be supplied by owner
Here is the catch, the owner of the building has told the tenent that under no circumstances shall any electrician pull a permit for job. I told her that i would't be intersted in doing the work without a permit.The tenent called and scheduled a meeting to speak to building owner tonight about this issue.
Also please let me know what you would do about the building owner/permit issue.I thought about calling inspector in the morning and giving him the address and expain the issue. Maybe just tell him to do whatever he wishes with the info. Thanks in advance for the help
I will post my numbers to see if i am close to anybody elses.Have to wait to get pricing from supply house tomm.
Last edited: