That's fine if you can get there before the flooring goes down. A lot of times I never see the place again until called for trim. I sometimes take pictures if it is more than code minimum devices. It would be good to use the paint and also take pictures right after you finish the rough.
I meant the subfloor. I always hope the jobs I do have the subfloor in before the walls go up.
I also do take pictures before the sheetrock.