hillbilly1
Senior Member
- Location
- North Georgia mountains
- Occupation
- Owner/electrical contractor
This is an existing installation. The panel board is full except for some of the High-Leg spaces are open.
This is a main lug panel board and left to right respectively, the far right lug is the High-Leg.
This is very common in my area, especially where linemen moonlight as electricians, they know the high leg goes to "C" phase in the meter for it's proper operation, but do not know its code to flip it to "B" in the disconnect or panel. And then there are those that see all of the "spare" slots, and connect 120 volt loads there!