I have a question on a high voltage wire pull. And the specifics are:
1- 500 kcmil al. wire 15kv.
2- 2500' long.
3- 2- 90.'s
4- 6" pvc conduit
5- splice to be made in manway.
The question is can i just serve the al. wire on to the pull rope with conventional method of stipping back the ins. and cutting several of the strands. or use a pulling eye? if pulling eye( for al).does anyone have a link?
My concern is with the al. wire breaking during the pulling. also i would like some sort of calculator to determine the pull tension on this run.
:-? :-? :grin:
1- 500 kcmil al. wire 15kv.
2- 2500' long.
3- 2- 90.'s
4- 6" pvc conduit
5- splice to be made in manway.
The question is can i just serve the al. wire on to the pull rope with conventional method of stipping back the ins. and cutting several of the strands. or use a pulling eye? if pulling eye( for al).does anyone have a link?
My concern is with the al. wire breaking during the pulling. also i would like some sort of calculator to determine the pull tension on this run.
:-? :-? :grin: