I have made mention of similar issues before but have come up with no real answers.
We are quoting a job on a horse barn. Has 2 concrete slabs on each side entrance with dirt floors between 4 stalls. I have no idea if the concrete has grid wire or rebar in it. I hope I don't have to break up the concrete to find out. Would it work to drill through slabs to ground and drive a rod at each? Or maybe drill sideways with a 3 foot bit and insert rebar for a longer contact surface? Or core drill a 4 inch hole, drive rebar to ground below and fill in with fresh concrete patch?
What has anyone done lately? I am also contacting head of inspections for that county for his opinion.
We are quoting a job on a horse barn. Has 2 concrete slabs on each side entrance with dirt floors between 4 stalls. I have no idea if the concrete has grid wire or rebar in it. I hope I don't have to break up the concrete to find out. Would it work to drill through slabs to ground and drive a rod at each? Or maybe drill sideways with a 3 foot bit and insert rebar for a longer contact surface? Or core drill a 4 inch hole, drive rebar to ground below and fill in with fresh concrete patch?
What has anyone done lately? I am also contacting head of inspections for that county for his opinion.