Electron_Sam78
Senior Member
- Location
- Palm Bay, FL
I'm arguing with a contractor at work that he has to install a GES at a new building that is supplied by a feeder about 700 ft away from the service. The service is a shed that has a panelboard in it that supplies RV pedestal circuits and the building in question. They say that the building, which has a metal water piping system btw, doesn't need a GES installed according to 250.32 since it was supplied with a GEC. They even point to that section in their argument. I pointed this out to the QA ispector and they have come to the conclusion that it comes down to interpretation of the code and that I am wrong. This is unbelievable!! Is there any way I can get an offical interpretation by the writers of that code section for this situation?