Good morning.
I was called in to "bid" on a project. Personally, I think I'm keeping his electrician honest with my number, but it was my wife that called on this (potential tenant for where she works so...)
Strip mall, a podiatrist will(may) be moving in.
I will better know the details later, but to walk in, should there be anything that I should know?
I'm thinking insulated ground (mc) for circuits. (if isolated ground is required, multi wire mc...)
Receptacles duplex and gfci "hospital grade" ??
Should lighting also be mc??
Back up systems??? x ray ???
How deep might I expect to get into Health Care with a doctor that cuts out ingrown toe nails or planters warts....?
I will read on (517).
Thank you for the heads up
I was called in to "bid" on a project. Personally, I think I'm keeping his electrician honest with my number, but it was my wife that called on this (potential tenant for where she works so...)
Strip mall, a podiatrist will(may) be moving in.
I will better know the details later, but to walk in, should there be anything that I should know?
I'm thinking insulated ground (mc) for circuits. (if isolated ground is required, multi wire mc...)
Receptacles duplex and gfci "hospital grade" ??
Should lighting also be mc??
Back up systems??? x ray ???
How deep might I expect to get into Health Care with a doctor that cuts out ingrown toe nails or planters warts....?
I will read on (517).
Thank you for the heads up