We are tasked to put 32 feet aluminum pole total with 25 ft above, 7 ft will be below grade and will be encased in concrete. After digging the 36 inches in diameter and 7 ft deep using an auger, the base soil look really loose. How do we go about compacting the bottom of hole? I doubt any equipment (wacky packer, vibratory sled) would fit in there. I was thinking of using a hand tamper, tying a rope at the top of the handle then drop it in the hole and start compacting it that way. I don't know if that is enough though. Any recommendation?