I have a project to add a small office building (around 3000 SQFT) 200 feet away from a big existing building. The existing building has an existing electrical yard with switchboard, generators, ATS cabinet, and panels in it. The switchboard has ground fault protection to each distribution circuit breaker. I am adding one distribution circuit breaker with ground fault protection in the existing switchboard and feed to the new office building. My question is "Do I need to treat the feeder to the new office building as electrical service?" . If it is a feeder, I shall run 3 phases + 1 neutral + 1 ground wires to new office. If it is a service, I shall run 3 phases + 1 neutral wires to new office, and install grounding system and bond them to service panelboard's main ground bar with neutral bar. Which way is correct? Thanks.:-?