how to size the MCCB and cable that feeding UPS unit,with reference from code
i have discussion with GE supplier, he advise that i can select the MCCB breaker and the conductor based on ULP panel load not the UPS capacity , considering battery load as well ,noting the UPS is not fully loaded any comments?