I'm working on running a 12470V line around to a new substation. I need to cross underneath some railroad tracks and I'm trying to find out how deep I need to be before I bore under the tracks. I am running sheilded wire in rigid pipe. My company owns the tracks, but I can't seem to find any specs on this. I was figuring on using the 300.50 table and going with the under roadway catagory. Can anyone tell me what this should be?