- Location
- Wisconsin
- Occupation
- PE (Retired) - Power Systems
Have to look to see if code mentions it...
The B-phase requirement is in the same section as the phase arrangment.
Of course things used to be done differently, but the NEC has had this requirement for maybe 3 decades now.